Time-Lapse Tuesday: Lubbock-Cooper High School Gym Floor Installation
Lubbock-Cooper High School Gymnasium Time Lapse from Parkhill, Smith & Cooper on Vimeo.
Lubbock-Cooper High School’s gymnasium addition is part of the LCISD 2014 bond. This time lapse shows the installation of the gymnasium floor. The installation of the floor includes five layers of materials:
1st Layer-6 MIL Vapor Retarder
2nd Layer-Zero/G Shock Pads
3rd Layer-Subfloor Panel
4th Layer-Subfloor Panel
5th Layer-1/2″ Maple